1370 Ontario St. - Mezzanine, Cleveland, Ohio 44113 • (216) 241-2630 / Fax: (216) 241-6516

Membership
News and Issues
Departments
Secretary-
Treasurers
Information
Communications
FELA
Events
Links
User Info

Safety Task Force

NTSB Hearings

Within three to six months after the accident, the NTSB may decide to hold either a broad scale "Public Hearing", or a lower scale "Deposition Hearing". In both types of hearings, the purpose is to examine witnesses under oath to learn more information or clarify certain issues. These hearings usually last from two to five days.

Submissions by the Parties to the Investigation

After the hearing has closed for a period of usually sixty days, the NTSB will receive and consider submissions from the parties as to their belief about:

  1. proposed findings,
  2. proposed probable cause(s), and
  3. proposed safety recommendations to prevent such accidents in the future.

This is a very important opportunity, and it is one that the STF utilizes to be able to be able to inject the "locomotive engineer's point-of-view" into the investigation process and the cause finding.

NTSB Technical Review

Following the hearing, usually within two to three months, a "Technical Review" is held by the NTSB at its headquarters in Washington, D.C. At this time, the final draft report of the Investigator-In-Charge is reviewed by all parties (including the BLE) for accuracy. The report is then "marked up" and presented to the NTSB Board.

NTSB Final Report

At a later public meeting held in Washington DC, the NTSB Board members review the entire file, and decide the probable causes, and issue their safety recommendations.

The final report is sent to the President and the Congress. This entire process takes about one year to unfold.

By Federal law, the entire process is open, and all information gathered is available to the BLE. The process is conducted in an impartial manner and the information supplied by the STF will be given meaningful consideration.

© 1997-2009 Brotherhood of Locomotive Engineers and Trainmen

 


Safety Task Force
STF Members
The National Transportation Safety Board (NTSB)
NTSB Hearings
STF Organization
STF Application
STF Preliminary Incident Report (PDF)

DAILY HEADLINES
November 20, 2009

AAR: U.S. rail freight volume down during Veterans Day holiday week
CN train crew now resting comfortably at home after hitting a rock/mud slide
TWU set to vote on SEPTA contract
Rail shippers, carriers see 2010 recovery
FRA study shows freight rail fuel efficiency up more than 20% since 1999
Buffett's Berkshire secures $8 billion loan for BNSF deal
Amtrak adding trains on Cascades route for Thanksgiving holiday
Montana sues BNSF over grain hauls
Opinion: New locomotives are green machines
Grand Central Terminal for Atlanta?
Report: 70 percent of Metra bridges need upgrades
Florida lawmakers confident about the passage of SunRail
CSX introduces ultra-low emission locomotives in Indiana
NS plan to run trains through park angers W.Va. officials
Amtrak extends fare promotion on Northeast Regional service
Rail grinding stirs some confusion
SEPTA moves ahead on extending R3 rail line
New York MTA sets final spending plan for 2010
UP derailment investigation continues in Ill.
Driver mistakes BNSF railroad tracks for road
Operation Lifesaver films distracted driving public service announcements
Midwest Association of Rail Shippers to host January meeting
Wisconsin land owner injured in ground collapse sues CSX
Union Pacific, San Antonio River Authority agree on new drift removal practices
CSX gives city $22,125 to plant trees along tracks
No Railroad Retirement benefit increase in 2010; Most retiree earnings limits remain at 2009 levels
Railroad Retirement annuities and pensions from work not covered by Social Security or Railroad Retirement
RRB: Medicare Part B Premiums for 2010
Final RRB Informational Conference of 2009 is Dec. 11

More Headlines